Project name: Chemnitz train station PTFE/ETFE exterior wall
Project location: Chemnitz
Film design: (inside) PTFE glass net/(outer) ETFE spray coating
Designer: GrüntuchErnst Planungsgesellschaft mbH
Building area, 1800 ㎡ (inside) / 3850 ㎡ (outside)
Construction time: 2013
With the refurbishment of the camis station, local traffic and long distance traffic will be combined under the same roof. The station has been given a new definition and is the gateway to an important transportation hub in the city. To this end, from the 1970s, the existing station halls have been dismantled, with only the remaining supporting structures, and the lower ones open to the city.
The printed dust-free ETFE mat is exterior wall. As an interactive LED media appearance, it will be projected from the surrounding environment to the facade and can be used for impressive lighting performance. The size of the ETFE mat can reach 230 x 30 cm as the largest external wall filler. The internal external wall of the station hall is covered with a flat PTFE glass fabric with a tight aluminum frame.
The above images are domestic and foreign ETFE application cases.